The battery also protects us from micro-outages, during which the system very quickly switches to “island mode,” and we power the facility either from the solar power plant or from the battery. The cost of acquiring the MES battery storage system, with a capacity of 150 kW and 576 kWh, was under 10 million crowns. According to calculations, the estimated payback period is about 8 years, but personally, I estimate it to be 5 years. The FENIX Group was recommended to us by our solar power plant supplier; we drove out to Jeseník, where the owners showed us everything we were interested in, and that convinced me.
Ing. Vladimír Kruliš
Owner of DK Styl